» Back to overview

Roadblock Garmisch - Ehrwald

Due to tree felling work, the railway line and the B23 from Ehrwald to Garmisch-Partenkirchen will be closed from 15 September until 26 September 2025. The work will be carried out from 8 a.m. to 6 p.m. From 6 p.m. to 8 a.m. and on Saturday, 20 September 2025 and Sunday, 21 September 2025, the B23 will be fully accessible. The route via Füssen (A7) is not affected!

  • Am 21. Mai 2022 ist es soweit